MM
Design Lead
Contract
On-siteEngineering Managementπ· £56.1k–£56.1k/yr
Mott MacDonald Bentley are recruiting for a Design Lead to join the Strategic Pipeline Alliance (SPA). The 330km Strategic Pipeline Alliance (SPA) Project by Anglian Water is under construction and will be completed during AMP8. Beyond this we have a further 260km of water transfer pipelines and associated infrastructure to be delivered in AMP8. What will you be doing as our new Design Lead? You will take a lead on design delivery of the Infra or Non-Infra element of major potable water transfeβ¦
Imported from adzuna β full advert at the source.